MRV Communications AE092FCAHA Manual de instrucciones Pagina 33

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 33
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 32
Installation check and trial operation
Check if the drain pipe and connection wires are arranged properly.
The drain pipe shall be put below. The connection wire shall be put above. Be sure to wrap
the drain pipe (especially the indoor part and the part inside the machine) with thermal ins-
ulating materials.
The drain pipe shall be made into slope. Avoid bulging up or down or phenomena shown
right figure in the run.
Installation check
* Do the supply voltage meet the requirement? * Could the drainage water completely
discharged to outdoor
*Are the power cord and the indoor/outdoor * Is there any gas leakage at the pipe joints?
connection wire connected properly?
Are the wires pressed firmly?
*Is the noise too big?
*Do the terminal numbers of the indoor/outdoor connection wire coincide with each other?
Is the pipe connection part thermally insulated?
Is the indoor unit mounted firmly and reliably?
Trial operation
The installation serviceman must conduct a trial operation and check:
* Does the temperature regulator work normally?
*Does the installation location selection meet the related requirements?
Wrap with the protective plastic tape
Wrap the connection pipe, the drain pipe and the connection wire together with PVC tape.
Caution:
The connection pipe must be wrapped individually with insulating material from down to up.
32
WT
BK
YW/GN
Vista de pagina 32
1 2 ... 28 29 30 31 32 33

Comentarios a estos manuales

Sin comentarios